Hope Street, Nottingham
|


|
Timescale and Cost
Approx £38,215 supply and erect. The erection period took only 3 weeks for this unique structure
Thermal Efficiency
This was the key driver for the client on this project, needing to maximise the performance of the fabric. U-value of less than 0.1W/m2K with air tightness of under 2m3/h/m2
Successful Project
This 4 bedroom house is the first of many for the client, who is keen to reduce CO2 and annual running costs to a minimum. This is the key benefit of the Twin Frame System from Frame Wise Ltd. Meeting tomorrows building regs with today's kerb appeal
To find out what the client thought about the build click here.
|

Castle Hill, Mere
|



|
Timescale and Cost
Approx £48,725 supply and erect of this Twin Frame Project covering approximately 220m2. The erection period was less than 3 weeks.
Thermal Efficiency
The main target for this project was Thermal Efficiency and air tightness for which we delivered a U-value of 0.15W/m2K and air tightness of 2m3/h/m2
Successful Project
This has been one of the most interesting jobs we have undertaken by using our latest Twin Frame Timber Frame and a Curved Barrel roof made of engineered I-joists with a full Sedum roof on after. The client really wanted the bungalow to get lost in the landscape. She has always wanted to do a self build and so now is living her dream.
  
|

St David's Street, Presteigne
 |
Timescale and Cost
Approx £35,000 supply and erect for this Twin Frame project. The erection period was around 2 Weeks.
Thermal Efficiency
By using our Twin Frame System and sustainable Warmcel insulation this project achieved a U-value of 0.1W/m2k and easily excelled the required air tightness of 5m3/h/m2
Successful Project
The clients were aiming to build an energy efficient home. Our Twin Frame system helped them achieve this.
|

|